CBIS refurbished a training academy interior, bringing together strip-out, drylining, electrical work, air conditioning, flooring, windows, joinery, doors and decoration.
A refurbishment spanning several trades
The work combined changes to the interior fabric with building services and fitted elements. The package included a new kitchenette alongside the drylining, flooring, joinery and finishing work.
The completed interior
The photographs show the furnished training room, completed kitchenette and interior finishes. Additional views show the glazing and circulation space during final fit-out, alongside an earlier refurbishment stage.